Widnes Vine Yard Signals

On Saturday 26 November 2005 Mike Turner and Dave Skipsey set about the daunting task of installing the Tony Sissons built gantry for Widnes Vine Yard - comprising signals VD101 and VD103 - the existing ballast was chopped back, a plastic base installed and finally the bracket was mounted - checking for squareness as we went.

Only after these photos were taken was the fluff noticed !!

Safe !

The site is prepared

Site ready for packing

Check it will stand square

Packing installed, holes for wires and pegs

Jigged ready for glue

Jigged ready for glue

Glued ! - now to the wiring, old signals visible

Loose the sponge please

Ta !!!

Looking very good

Only wiring and software control to go ....